Painting & cleaning · FREE PLANNING TOOL
Cleaning workload & consumption
Build a named task schedule using measured solution consumption, practical productivity and product dosage.
Need help with the inputs? How to estimate cleaning solution and labour requirements · See a worked example
WORKED EXAMPLE
How to estimate cleaning solution and labour requirements
| Step / input | Worked example |
|---|---|
| Work schedule | 1,000 m² cleaned once daily for 22 days |
| Solution before allowance | 1,000 ÷ 50 m²/L × 22 = 440 L |
| With 5% solution allowance | 462 L ready-to-use solution |
| At 2% final-volume dosage | 462 × 0.02 = 9.24 L concentrate |
| Cleaning time | 1,000 ÷ 250 m²/person-hour = 4 hours per occurrence |
| Plus 10 minutes setup each time | (4 + 10/60) × 22 = 91.67 person-hours |
Check before using the result
A machine’s theoretical maximum is not necessarily its practical site productivity. Do not treat workload hours as a full staffing roster without allowing for breaks, relief, travel, supervision and downtime. The displayed chemical-plus-labour figure is not a complete contract price.
Read the full cleaning workload & consumption guide →Method, assumptions & scope
Task occurrences = occurrences/day × operating days. Solution = area ÷ solution coverage × occurrences × allowance. Labour = (area ÷ practical productivity + setup minutes/60) × occurrences. Concentrate uses the explicitly selected dilution basis.
Use observed productivity or a practical supplier rate; do not substitute a theoretical machine maximum without adjustment. Setup/refill time is additional to productive cleaning time.
All tasks use the one named chemical. This is a workload estimate, not a complete staffing roster: breaks, travel between sites, leave relief, supervision and equipment downtime are excluded unless included in your rates.
Example quantities and rates are illustrative. Replace them with measurements, product data and current supplier rates for your project. A zero price means no price has been supplied.
Technical references
Method reviewed 4 November 2026. References support the approach; manufacturers have not approved or endorsed this calculator.
Related tools
Prepare the rest of your bid.
Tender Pilot helps you understand requirements, organise documents and prepare your tender response. Professional and Business plans include tender costing tools.
Try Tender Pilot free →