Business & pricing · FREE PLANNING TOOL
Production & sales overhead allocation
Allocate a named period’s salaries, energy and other operating costs across actual production or sales.
Need help with the inputs? How to allocate salaries and overheads per meal or sale · See a worked example
WORKED EXAMPLE
How to allocate salaries and overheads per meal or sale
| Step / input | Worked example |
|---|---|
| Period salaries | R100 |
| Meals produced | 80 → R100 ÷ 80 = R1.25 per produced meal |
| If all 80 meals sell | R1.25 overhead recovery per sold meal |
| If only 60 meals sell | R100 ÷ 60 = R1.67 per sold meal |
| Two sales-value drivers: R3,000 and R2,000 | Allocate 60% and 40% of the pool respectively |
Check before using the result
An equal amount per unit assumes comparable units. One snack and one full meal may not be suitable equal allocation drivers. Units sold can exceed current production when opening stock is sold. This tool allocates the cost pool; it does not calculate ingredients, full cost of sales or net profit.
Read the full production & sales overhead allocation guide →Method, assumptions & scope
Pool = sum(period costs). Production average = pool ÷ total units produced; sales-recovery average = pool ÷ total units sold (comparable units only). Product allocation = pool × product allocation driver ÷ total driver.
This allocates only the entered cost pool, not ingredient costs or the full cost of sales. It does not calculate net profit. Do not count the same salaries or energy again in another costing layer.
Production and sales can differ. Sold units may include opening stock. Production-average and sold-average figures assume comparable units; revenue or labour-hour allocation can be more suitable for different products.
A product with allocated costs and no sales cannot recover those costs through sales in this period. No silent division by zero is used.
Example quantities and rates are illustrative. Replace them with measurements, product data and current supplier rates for your project. A zero price means no price has been supplied.
Technical references
Method reviewed 4 November 2026. References support the approach; manufacturers have not approved or endorsed this calculator.
Related tools
Prepare the rest of your bid.
Tender Pilot helps you understand requirements, organise documents and prepare your tender response. Professional and Business plans include tender costing tools.
Try Tender Pilot free →