The first calculation is wet concrete volume. The next calculation depends on how concrete will be supplied. A complete premix bag contains more than cement, so its bag count cannot be used as a cement-only requirement.

Open concrete volume & supply planning calculator →

What to enter and why

  1. List each rectangular or cylindrical element with its dimensions and count. Convert thickness or height from millimetres to metres.
  2. Sum geometric volumes and apply the stated allowance for the project.
  3. For ready-mix, enter the supplier’s ordering increment, rate and delivery or short-load charge.
  4. For complete premix bags, use the manufacturer’s mixed yield in litres per bag.
  5. For site mixing, enter the specified cement, sand and stone quantities per wet cubic metre from the applicable mix schedule.

Worked example

Illustrative inputs only. Product rates, yields and approved production quantities must come from your actual work.

Step / inputWorked example
Slab volume5 m × 5 m × 0.1 m = 2.5 m³
With 5% allowance2.5 × 1.05 = 2.625 m³
Ready-mix at 0.1 m³ incrementsRound order to 2.7 m³
Complete premix at a declared 17 L/bag2,625 ÷ 17 → 155 complete bags
Illustrative specified cement schedule400 kg/m³ × 2.625 m³ = 1,050 kg → 21 × 50 kg cement-only bags

What can change the result?

The example cement schedule is arithmetic, not a recommended structural mix. Strength, water content, aggregate properties and application requirements cannot be established from volume alone. Reinforcing, formwork, subbase, water and admixtures are outside this tool’s material total.

Useful answers

Are cement bags and concrete bags interchangeable?

No. Complete premix includes cement and aggregates. Cement-only bags require the other specified materials.

Can the calculator choose a concrete strength?

No. Enter the project’s specified product or mix schedule; the tool does not design or approve it.

Why is ordered volume higher than calculated volume?

An allowance or the supplier’s order increment can increase the amount to order above geometric volume.

Use the method on your own figures.

Enter your measurements and assumptions in the calculator, then review its detailed result.

Use the concrete volume & supply planning tool →

Sources and method references

Sources support the method; they do not endorse or certify this guide or calculator. No professional qualification or product approval is implied.

Related reading

Preparing a tender?

Check the buyer’s scope, quantities and pricing instructions before transferring your figures. Tender Pilot helps you organise requirements, documents and the work needed for your response.