Construction · FREE PLANNING TOOL

Tiles, adhesive & grout

Measure named rooms, allow for joints and cuts, then calculate purchase boxes and optional product-based setting materials.

WORKED EXAMPLE

How to calculate tiles, boxes, adhesive and grout

Step / inputWorked example
Simple area example25 m² ÷ (0.5 m × 0.5 m), zero gap = 100 tiles
Extra allowance100 × 1.10 = 110 tiles
Purchase boxes110 ÷ 4 → 28 boxes, containing 112 tiles
Separate grid example5 m square, 600 mm tiles, 3 mm joints → 9 × 9 = 81 tiles before extras
Adhesive example25 m² × declared 4 kg/m² = 100 kg → 5 × 20 kg bags

Check before using the result

Do not add the same cutting loss twice: no-cut-reuse grid counting already makes a conservative allowance at room edges. Neither method optimises a cutting plan. Product consumption figures are not universal adhesive or grout recommendations.

Read the full tiles, adhesive & grout guide →

Method, assumptions & scope

Effective module area = (tile length + gap) × (tile width + gap). Area base = net area ÷ module area. Straight-grid base = sum(ceiling((room length + gap)/(tile length + gap)) × ceiling((room width + gap)/(tile width + gap))). Apply extra allowance and round units up. Deduct stock; round up whole boxes. Optional adhesive/grout kg = net area × supplier kg/m².

Area mode uses the joint module and net area. Straight-grid mode rounds rows and columns up separately and assumes no cut reuse; it counts the gross rectangular layout without deducting excluded areas, because their positions are unknown. Neither mode optimises cuts or draws a layout. Set the extra allowance to avoid counting the same cutting loss twice.

Adhesive and grout use manufacturer consumption for the actual tile, trowel and joint. Setting-material consumption uses net tiled area, not spare tiles; your supplier rate must include the required application allowance.

Example quantities and rates are illustrative. Replace them with measurements, product data and current supplier rates for your project. A zero price means no price has been supplied.

Technical references

Method reviewed 4 November 2026. References support the approach; manufacturers have not approved or endorsed this calculator.

Related tools

Prepare the rest of your bid.

Tender Pilot helps you understand requirements, organise documents and prepare your tender response. Professional and Business plans include tender costing tools.

Try Tender Pilot free →