Construction · FREE PLANNING TOOL
Tiles, adhesive & grout
Measure named rooms, allow for joints and cuts, then calculate purchase boxes and optional product-based setting materials.
Need help with the inputs? How to calculate tiles, boxes, adhesive and grout · See a worked example
WORKED EXAMPLE
How to calculate tiles, boxes, adhesive and grout
| Step / input | Worked example |
|---|---|
| Simple area example | 25 m² ÷ (0.5 m × 0.5 m), zero gap = 100 tiles |
| Extra allowance | 100 × 1.10 = 110 tiles |
| Purchase boxes | 110 ÷ 4 → 28 boxes, containing 112 tiles |
| Separate grid example | 5 m square, 600 mm tiles, 3 mm joints → 9 × 9 = 81 tiles before extras |
| Adhesive example | 25 m² × declared 4 kg/m² = 100 kg → 5 × 20 kg bags |
Check before using the result
Do not add the same cutting loss twice: no-cut-reuse grid counting already makes a conservative allowance at room edges. Neither method optimises a cutting plan. Product consumption figures are not universal adhesive or grout recommendations.
Read the full tiles, adhesive & grout guide →Method, assumptions & scope
Effective module area = (tile length + gap) × (tile width + gap). Area base = net area ÷ module area. Straight-grid base = sum(ceiling((room length + gap)/(tile length + gap)) × ceiling((room width + gap)/(tile width + gap))). Apply extra allowance and round units up. Deduct stock; round up whole boxes. Optional adhesive/grout kg = net area × supplier kg/m².
Area mode uses the joint module and net area. Straight-grid mode rounds rows and columns up separately and assumes no cut reuse; it counts the gross rectangular layout without deducting excluded areas, because their positions are unknown. Neither mode optimises cuts or draws a layout. Set the extra allowance to avoid counting the same cutting loss twice.
Adhesive and grout use manufacturer consumption for the actual tile, trowel and joint. Setting-material consumption uses net tiled area, not spare tiles; your supplier rate must include the required application allowance.
Example quantities and rates are illustrative. Replace them with measurements, product data and current supplier rates for your project. A zero price means no price has been supplied.
Technical references
Method reviewed 4 November 2026. References support the approach; manufacturers have not approved or endorsed this calculator.